Long Island Weddings
Tent permits, Nassau and Suffolk

Tent permits for a Long Island wedding, town by town

New York's fire code asks for approval above 400 square feet, but that is a floor rather than the rule. Smithtown and Glen Cove want a permit at 120 square feet. Islip allows a tent in a residential district for 72 hours and no longer, and a Nassau County wedding needs a county Fire Marshal permit on top of the town one. Six municipalities publish no size at all. Here is what each of the thirteen towns and two cities actually prints, with the fee, the duration and the office that issues it.

Long Island wedding Long Island wedding detail

The state sets the floor at 400 square feet, and five Long Island municipalities go lower

New York's fire code requires approval for a tent above 400 square feet. Two things about that figure matter before you rely on it. First, it is a floor: a town may require a permit sooner, and several here do, two of them at 120 square feet. Second, the code edition changed. The Department of State's own adoption notice says the 2025 Uniform Code repealed the 2020 edition, that the effective date of the 2025 Uniform Code is December 31, 2025, and that from that date permit applications must comply with it. Section numbers moved between editions, so a page quoting a 2020 section number is quoting a repealed edition.

We could not read the code text at the authority. It is published on the International Code Council platform, which returns a page with no code text to us and marks the section as requiring an account. So the wording below is quoted from two municipal reprints, named as reprints rather than as the authority, and they agree on the 400 square foot figure while differing in wording.

“FCNYS 3103.2 Approval required. Tents and membrane structures having an area in excess of 400 square feet (37 m2) shall not be erected, operated or maintained for any purpose without first obtaining a permit and approval from the fire code official.” as reprinted by the Nassau County Fire Marshal and by the Town of Brighton Fire Marshal

What follows is each municipality's own rule, which is the one your rental company will be asked for.

Every town and city, with the figure each one publishes

Tent permit rules for the thirteen Long Island towns and two cities, read from each municipality's own code or its own application form on 27 September 2026. Source label: first party.
MunicipalityPermit needed forHow long a tent may standFee as publishedWho issues it
City of Glen Cove120 square feet180 days$125.00 per tentBuilding Department
Town of Smithtownmore than 120 square feetup to four months for a community facility use$300Chief Building Inspector
Town of Babylon120 square feet residential, 200 commercialnot published$150Fire Marshal
Town of Islipmore than 200 square feet residential, 400 elsewhere72 hours in a residential district$75 in the code, $100 on the form, $300 commercialFire Marshal
Town of Huntingtonmore than 200 square feet, or 400 for a canopynot published for tents$125.00Fire Marshal
Town of Brookhavenmore than 400 square feet10 days without Planning Department approval$225.00 to $336.00 by sizeFire Marshal
Town of East Hamptonany temporary tent, with three listed exemptionsless than two weeksno charge under 200 square feet, then $45.00 upwardFire Marshal
Town of Southoldany tent, unless the property is a single family dwellingmaximum 30 days$100 per tentBuilding Department in the code, Fire Marshal on the form
Town of North Hempsteadnot published as a size15 days, extendable by 15$500.00 residential, $750.00 commercialCommissioner of Buildings
Town of Southamptonnot published as a sizenot publishedno charge under 200 square feet, then $100.00 upwardFire Marshal
Town of Riverheadnot published as a size180 days in a 12 month period$181.00 to $258.00, commercial and industrial onlyFire Marshal
Town of Shelter Islandnot publishednot publishedtwo Town documents disagreeBuilding Department
Town of Hempsteadnot published as a sizenot published for tentsno tent line item; the general building permit fee appliesBuilding Department
Town of Oyster Baynot published as a sizenot published for tentsno tent line item; the general building permit fee appliesBuilding Division
City of Long BeachCity permit for any tent; 200 square feet is the County figure it citesnot publishedno tent line item publishedCity Clerk or Building Department

Six of the fifteen publish no size at all. That is not the same as no permit. Hempstead, North Hempstead and Oyster Bay each treat a tent as a structure that needs a building permit at any size. Southold asks for a permit on any property that is not a single family dwelling. East Hampton asks for one on any temporary tent, with three listed exemptions. Southampton requires a Fire Marshal permit to erect a tent, without stating a threshold. The blank cells say not published because we would otherwise be inventing a number.

Islip gives a backyard wedding 72 hours, and it is in the code, not a handout

This is the strictest duration rule we found anywhere on Long Island, and it catches the classic parents' garden wedding: the tent, the setup and the takedown all have to fit inside three days.

“No tent(s) or canopy(ies) for which a permit is required shall be erected or maintained in any residential use district for a period of time in excess of 72 hours.” Code of the Town of Islip § 68-433C

In a commercial district Islip allows 30 days for a retail use and 180 days for a restaurant use. Its own application also asks for filing at least 14 days before the event.

Two towns require a permit at 120 square feet, which is smaller than most dance floors

Smithtown's threshold is in its code and is not tied to a wedding at all.

“No tent covering an area of more than 120 square feet shall be erected, maintained, operated or used except with a permit from the Chief Building Inspector of the Town of Smithtown.” Code of the Town of Smithtown § 273-1A

Glen Cove publishes the same 120 square foot figure on its tent permit application, at $125.00 per tent, on a form we could read only as a scan, so we are describing it rather than quoting it. Huntington requires a permit above 200 square feet for a tent and 400 for a canopy, at $125.00 (Code of the Town of Huntington § 111-77). Brookhaven stays at the state's 400 square feet and prices by size, $225.00 from 401 to 1,000 square feet and $336.00 from 1,001 to 2,000, on its 2026 Fire Marshal fee schedule (Town of Brookhaven Code § 30-193).

In Nassau you need two permits. In Suffolk, usually one

Nassau County's own fire prevention ordinance sets a threshold below the state's and applies on top of the town, city or village permit.

“14.8.1 A tent permit shall be secured prior to the erection and/or use of a tent or membrane structure having an area greater than two hundred (200) square feet or for any canopy having an area greater than four hundred (400) square feet.” Nassau County Fire Prevention Ordinance § 14.8.1

Nassau's own fee schedule prints $60 above 200 square feet, $110 above 400, and $150 for any tent with cooking. One caveat we will not paper over: the ordinance PDF the County publishes is titled 2023 and carries a draft watermark, so check the figure with the Fire Marshal's office before you budget it.

Suffolk County is different in kind. Its Fire Marshal publishes a tent permit requirement at the same 200 and 400 square foot figures, but in the context of events on County property. We found no Suffolk County ordinance reaching private land, and no County fee at all.

“1. All tents having an area in excess of 200 square feet and all canopies in excess of 400 square feet require a Tent Permit Application to be filed with the Suffolk County Fire Marshals Office.” Suffolk County Fire Marshal

So for a Suffolk backyard or vineyard, the town permit is normally the whole story. For a Nassau one, budget for two.

Where a town's own documents disagree, both figures are here

This happens more often than it should, and averaging them would invent a number that no office published.

Ask the issuing office which document governs, and get the answer in an email.

On the East End a wedding is exempt in Southampton and is not in East Hampton

Both towns run a special event permit alongside the tent permit, and they treat a wedding in opposite ways. Southampton exempts one.

“A wedding of a property owner, a member of the property owner's family, or a tenant legally occupying the property pursuant to a written lease agreement establishing tenancy for not less than six consecutive months, provided such tenancy is permitted by the certificate of occupancy and/or a permit issued under Chapter 270 of the Town Code;” Southampton Town Code § 283-2A(3)(c)

East Hampton does the reverse. Its Chapter 151 defines an assembly to include weddings, requires a residential special event permit for an assembly of 50 people or more on residential property, and does not list a wedding among its exemptions. Its fees come from Resolution 2026-140, effective 8 January 2026. A residential event for a Town resident carries no application or permit fee, a non resident pays $150 plus $250, and a commercial event on commercial property is $200 plus $250 per day.

East Hampton also effectively bars a tent on the beach.

“Unless utilized as part of an event held by valid charitable organizations as defined herein, the installation of tents, other than those necessary for food service under Suffolk County Department of Health Services regulations, shall not be permitted.” East Hampton Town Code § 151-3C(1)(a)

Filing windows matter as much as fees out here: Southampton requires a special event application at least 90 days before the event. Our related reading: the rules for a Hamptons private estate wedding, the East Hampton beach wedding permit, and when outdoor music has to stop, town by town.

Eight questions for the tent rental company, before the deposit

  1. Which permit are you pulling, the town one, the county one, or both?
  2. Is the permit fee inside your price or billed on at cost?
  3. What is the total square footage you are quoting, counting tents within 12 feet of each other as one?
  4. How many hours before the ceremony do you set up, and does that fit the duration limit here?
  5. Who files the site plan, and does this tent size need a stamped engineer's drawing?
  6. Is there cooking under any tent, and does that change the county permit?
  7. What is the late filing fee if the date moves?
  8. Who pays if the inspector fails the tent on the day?

What we could not read, and where we stopped

The state code text sits behind an account on the publisher's platform, so the state wording here is from two municipal reprints. Glen Cove's tent application is a scanned image with no text layer, so we describe it rather than quote it. Long Beach publishes no tent fee figure at all, and its Building Department page says to telephone for prices, so we print none. Two North Hempstead document paths return a missing page today, and the same tent requirements sheet was read on a Town program domain instead. Riverhead's fee schedule covers commercial and industrial properties only, so a Riverhead residential tent fee is not published.

Every figure above was read on 27 September 2026 on the municipality's own site, its own code volume or its own form. Codes and fee schedules change, and a permit clerk outranks us. All Long Island wedding guides.

Sources: each municipality's own code or application form, linked in the table above · NYS Department of State, 2025 Uniform Code adoption notice · Nassau County Fire Prevention Ordinance, Article XIV · Suffolk County Fire Marshal, tents and canopies · Southampton Town Code Ch. 283 · East Hampton Town Code Ch. 151
Read on 27 September 2026. Nothing here is legal advice; confirm with the issuing office before you sign a tent contract.

Short answers, with the source for each

Do I need a permit for a tent in my parents' backyard on Long Island?

In most towns yes, and the size that triggers it varies. Smithtown and Glen Cove require one above 120 square feet, Islip and Huntington above 200, Brookhaven above 400, and Southold, East Hampton, Hempstead, North Hempstead and Oyster Bay effectively require one for any tent. In Nassau County a county Fire Marshal permit is required on top of the local one above 200 square feet.

How long can a wedding tent stay up?

Islip caps a tent in a residential district at 72 hours. East Hampton allows less than two weeks before a building permit is needed instead. North Hempstead allows 15 days with one 15 day extension, Southold a maximum of 30 days, Brookhaven 10 days without Planning Department approval, and Riverhead 180 days in a 12 month period.

What does a tent permit cost on Long Island?

Published figures run from no charge under 200 square feet in East Hampton and Southampton to $500.00 residential in North Hempstead. Glen Cove and Huntington publish $125.00, Babylon $150, Smithtown and Islip $300 commercial, Southold $100 per tent. Long Beach, Hempstead and Oyster Bay publish no tent fee line at all.

Does Nassau County need a separate tent permit?

Yes. Nassau County Fire Prevention Ordinance section 14.8.1 requires a county permit for a tent above 200 square feet or a canopy above 400, in addition to the town, city or village permit. Suffolk County publishes the same figures only for events on County property.

Is a family wedding exempt from a special event permit in the Hamptons?

In Southampton a wedding of the property owner, a family member or a long term tenant is exempted by section 283-2A(3)(c). In East Hampton it is not: Chapter 151 defines an assembly to include weddings and the exemption list does not cover them.

More Long Island guides

All guides ›
Seasonality, Nassau and Suffolk
When Long Island weddings actually happen

Suffolk County recorded 1,039 marriages in October 2022 and 333 in January. Month by month counts for Nassau and Suffolk from NYS DOH Table 47.

Read
Permits and rules, East Hampton
The East Hampton beach wedding permit, in plain terms

East Hampton Town caps catered beach weddings at 50 attendees and bans amplified music on the sand. Town and Trustees permits, fees from $75, deadlines.

Read
Noise codes, Southampton
Southampton noise rules: the village line decides when the music stops

The Village of Southampton added a wedding noise exception on 11 July 2024. The Town of Southampton did not, and cuts outdoor amplified sound at 7pm.

Read
Estate rentals, East Hampton
Hamptons private estate weddings: Town Chapter 151 and Village Chapter 139, side by side

Chapter 151 in East Hampton Town and Chapter 139 in the Village both require a permit at 50 people. Deadlines, tents, parking, insurance and fines.

Read